All standards
Checklist
Field Scanner Checklist
Step-by-step field checklist covering pre-mobilization, on-site setup, capture, and demobilization for scanner partners.
Last updated: Jun 2026
Pre-Mobilization
On-Site Setup
During Capture
Before Leaving Site
Never demobilize until a coverage preview confirms the deliverable can be met. A return trip is far more costly than an extra 20 minutes on site.
Ready to capture your site?
Tell us about your project and we'll assign a local scanner and scope your Scan to BIM deliverables.